Project: 001105

In Process

.
Dubai | United Arab Emirates

Making of Tv wall unit with approved design

Status: The work is currently ongoing.

Property type is Apartment

Estimated completion time is 7 working days

Project Timeline

  • Loading...

    Next update in progress

  • May 8, 2026

    Installation Completed

  • May 8, 2026

    Installation in Progress

  • May 7, 2026

    New added socket requirement

  • May 6, 2026

    Finishing continued

  • May 5, 2026

    LED color shade / lighting arrangement modified after installation

  • May 5, 2026

    LED lighting initially installed on 3-button control system, later revised to include an additional dimmer system.

  • May 4, 2026

    Console color changed after production processing

  • May 4, 2026

    Console drawers mechanism changed to lower hinges and upgraded mechanism

  • May 2, 2026

    Approved paint color changed to texture during execution, requiring repainting work

  • May 1, 2026

    Media wall installation in progress

  • April 30, 2026

    Console drawers changed in quantity 5 to 3 Needs reallocation

  • April 29, 2026

    Wall paint and textured changed on client request

  • April 29, 2026

    Media console scheduled for installation

  • April 28, 2026

    Wall preparation completed

  • April 27, 2026

    Wall painting in progress

  • April 26, 2026

    Work Started

  • April 25, 2026

    Work is on hold

  • April 24, 2026

    Project Booked

Project Details

  • TV Media wall | Width: 300 cm x Height: 313.5 cm Details: TV will be centered on the wall with a full-length floating console. The console will be extended to cover the switchboard, which will be concealed inside the middle drawer with proper cable management. Wall behind TV will have a warm textured finish with slim MDF borders. LED lighting will be provided at the top and below the console for a clean floating effect. Overall design will be minimal, symmetrical, and with all wiring hidden. Scope of Work: Production, delivery, installation, and site cleaning.

More Projects Completed by Instylea

  • 001007 (4)
    Project: 001007 Completed
    Ajman Villa
    Furniture upholstery, Carpet Installation and installation of curtains
  • Project: 001008 Completed
    Abu Dhabi Apartment
    Blackout and Sheer curtains for the rooms
  • WhatsApp Image 2025-03-27 at 05.24.36_ca4b6ce0
    Project: 001009 Completed
    Sharjah Villa
    Wavy Blackout and Sheer curtains for the Villa rooms and halls
  • IMG_1176_20250725215156
    Project: 001010 Completed
    Dubai Apartment
    Blackout and Sheer curtains for the rooms
  • 1011 (3)
    Project: 001011 Completed
    Al Taawun Dubai Apartment
    Installation of Wavy Curtains for the windows
  • IMG_1466_20250725215159
    Project: 001012 Completed
    Dubai Apartment
    Installation of Roman Blinds for the windows